The client wanted to acquire a building in Paris to bring together all the headquarters activities in the same location, and after several unsuccessful visits he had the opportunity to purchase a 2,100 m corner building2, spread over 8 levels and ideally located in the heart of the Golden Triangle of the 8th arrondissement.
Heavy structural rehabilitation work ordered by the then-owning investment fund is about to begin. Their aim is to bring together office space rented to several tenants to rent the building thus unified. The project owner decides to call on the Gaignard & Genevois Agency and entrust it with the design and project management missions of the contractor.
The challenge was significant: a race against time then began to propose an implementation that was both perfectly adapted to the current needs and projected five years from the client, while fitting into the constraints of an already established hull rehabilitation project and not very modifiable, and by identifying possible modifications. This expert work required constant anticipation so as not to impact the overall work schedule.
Learn more
The architectural concept was structured around a double reading of the services, distinguishing common work spaces from prestigious areas: • A careful level of services, designed for efficiency and everyday comfort on current floors. • A resolutely high-end treatment in the reception and management spaces.
It is here that the agency deployed all its know-how, integrating tailor-made elements of great finesse:
Layered marble carpet floors.
The exterior grilles as well as the guardrails of the staircase in artistic ironwork, custom designed.
Molded panels and integrated furniture made of solid oak.
Staff ceilings and custom lighting, inspired by period pieces, ensuring a cozy atmosphere.
The construction took place in complex conditions, in particular due to the overlapping of the sites and a significant delay accumulated by the lessor's work. The agency has selected highly qualified companies to guarantee impeccable quality of execution. Thanks to constant vigilance and rigorous management, the team managed to maintain a maximum level of requirements on services, delivering the project within the agreed deadlines and respecting the initial budget.
This building, much more than a simple grouping of activities, is now establishing itself as an emblematic address, realizing a vision where business architecture combines with artisanal excellence.